Case Studies

A selection of our previous work

Pump station / sewage treatment plant national proactive maintenance programme

Swan was appointed by our client to deliver a combined reactive and proactive maintenance contract covering a portfolio of pumping stations and sewage treatment plants across their national network. The client had experienced significantly high costs associated with reactive maintenance in the previous financial year and was keen to reduce these unplanned expenditures through a […]

Motor Fuel Group, Sheffield

This £78,000 project, completed over a 4-week period, involved essential underground infrastructure works aimed at improving foul water management and site drainage efficiency. The scope began with the installation of a new foul pump system, designed to enhance the movement of wastewater from lower to higher elevations, ensuring consistent flow and reducing the risk of […]

Scottish Fire & Rescue

This £350,000 project, delivered over an 8-week period, focused on critical fuel infrastructure and drainage upgrades to support operational efficiency and environmental compliance. The works began with the installation of a new drainage system, designed to handle increased surface water capacity and prevent site flooding. ACO drainage channels were installed to facilitate efficient surface water […]

Shell, Newark

The project involved a comprehensive upgrade of an existing sewage treatment facility with a total value of £125,000, completed over a six-week period. The scope of works began with the safe demolition and removal of the outdated sewage treatment plant, ensuring full compliance with environmental and health and safety regulations. Following this, we installed a […]

Push wall construction for waste storage

The project works required the repair and installation of waste containment walls for a valued client. The project works comprised: demolition of existing push walls, unbolting and repositioning existing concrete panel walls, supply and installation of prefabricated concrete wall sections, track cut of existing concrete walls, cast in situ extension to the height of a […]

Fuel storage and delivery area development.

Swan were asked to carry out a new development to add site fuelling facilities and associated drainage infrastructure for a valued client across two sites. The works comprised: Installation of concrete fuel tank pad, Installation of new class 1 full retention interceptor and alarm, installation of ACO drainage around the refuelling area, installation of new […]